Waterside generation, flexible connections
Our FNPP model locates generation at suitable coastal or waterside sites. Power can reach data centers nearby or farther inland through the grid or dedicated connections, according to the project and market.
The data center does not have to be beside the plant. Early planning would assess available grid capacity, any required network upgrades, and dedicated connections, aligning infrastructure delivery with the campus development schedule.
The water-based model offers an alternative where land for a terrestrial nuclear plant is constrained. Shipyard construction moves much of the build into an industrial setting, reducing the work required at the deployment site. Site assessment, licensing, and connection infrastructure remain part of each project.